Please use this identifier to cite or link to this item:
http://hdl.handle.net/1843/44976
Type: | Artigo de Periódico |
Title: | Strategic environmental assessment - sea of the Hydroelectric Generation Program of Minas Gerais - HGPMG as an environmental management instrument |
Authors: | Wilson Pereira Barbosa Filho Lívia Maria Leite da Silva Antonella Lombardi Costa Irene Albernaz Arantes Nathan Vinícius Martins da Silva Karina Aleixo Benetti de Oliveira |
Abstract: | The Strategic Environmental Assessment – SEA, as an environmental management instrument, refers to the consequences of the policies, plans and programs (PPPs), usually within the scope of governmental initiatives, despite the fact that it can also be used in private organizations. It also allows the compatibility analyse of the PPP that is being studied comparing with others governmental PPPs (horizontal articulation). The SEA of the Minas Gerais Hydroelectric Generation Program (MGHGP) was organized in three big steps that were divided in six consecutives blocks of analysis, each one with a set of interdependent activities to be accomplished and the product to be generated. The study was entirely based in secondary data, thus, the results were associated to the availability and spatiality of the acquired information. The entire work was done considering the 175 hydroelectric plants (operation, concession and under construction), the 380 plants envisaged by the Minas Gerais Hydroelectric Generation Program (MGHGP), eight hydrographic basins from the territory of Minas Gerais, and 34 Water Resources Planning and Management – WRPMs. This article aims to discuss the obtained results and evaluate possible projections. it was evidenced the need to obtain the greatest possible expansion of the hydroelectric generating park in a sustainable way, what implies in the solution of equations that did not exist in the past, requiring the diversification of the Minas Gerais electrical matrix, the use of new technologies, the improvement of energy efficiency, as well as a holistic vision and technical capacity of the entities involved. |
Subject: | Engenharia Nuclear |
language: | eng |
metadata.dc.publisher.country: | Brasil |
Publisher: | Universidade Federal de Minas Gerais |
Publisher Initials: | UFMG |
metadata.dc.publisher.department: | ENG - DEPARTAMENTO DE ENGENHARIA NUCLEAR |
Rights: | Acesso Aberto |
URI: | http://hdl.handle.net/1843/44976 |
Issue Date: | Oct-2017 |
metadata.dc.url.externa: | https://www.researchgate.net/publication/323897234_STRATEGIC_ENVIRONMENTAL_ASSESSMENT_-_SEA_OF_THE_HYDROELECTRIC_GENERATION_PROGRAM_OF_MINAS_GERAIS_-_HGPMG_AS_AN_ENVIRONMENTAL_MANAGEMENT_INSTRUMENT |
metadata.dc.relation.ispartof: | American Journal of Hydropower, Water and Environment Systems |
Appears in Collections: | Artigo de Periódico |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
STRATEGIC ENVIRONMENTAL ASSESSMENT – PDFA.pdf | 2.37 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.