Please use this identifier to cite or link to this item: http://hdl.handle.net/1843/56945
Full metadata record
DC FieldValueLanguage
dc.creatorCarlos Eduardo Velasquez Cabrerapt_BR
dc.creatorFidéllis Bitencourt Gonzaga Louzada e Estanislaupt_BR
dc.creatorClaubia Pereira Bezerra Limapt_BR
dc.creatorMaria Auxiliadora Fortini Velosopt_BR
dc.creatorAntonella Lombardi Costapt_BR
dc.date.accessioned2023-07-25T17:23:46Z-
dc.date.available2023-07-25T17:23:46Z-
dc.date.issued2018-
dc.citation.issue4pt_BR
dc.citation.spage386pt_BR
dc.citation.epage392pt_BR
dc.identifier.urihttp://hdl.handle.net/1843/56945-
dc.description.abstractUm dos tópicos mais importantes sobre programas nucleares é o desenvolvimento econômico de seu sistema de energia nuclear. Um dos programas mais notáveis ​​foram os sistemas de energia nuclear do Reino Unido. Seu primeiro reator nuclear comercial conectado à rede foi o Calder Hall -1 em Seascale em 1956. Depois disso, 45 reatores construídos até 1995 para produção de eletricidade. Atualmente, 30 delas estão permanentemente fechadas e 15, que representam cerca de 19% da matriz energética do Reino Unido, ainda estão em operação. Apesar do último reator construído em 1995 ter sido um PWR - SIZEWELL-B conectado à rede há 23 anos, o governo do Reino Unido planeja construir novas usinas de geração para fornecer 19 GWe até 2025 e pretende ter 16 GWe adicionais até 2023. Este trabalho mostra as necessidades econômicas do programa nuclear do Reino Unido para continuar com seu programa nuclear. O software MESSAGE foi utilizado na análise levando em consideração o preço spot do urânio na época. Os resultados indicam o investimento do governo necessário para substituir a maior parte de sua frota atual por uma nova frota de reatores até 2025. Este trabalho também avalia a economia do ciclo do combustível nuclear compreendendo: preço da mineração, fabricação de combustível, quantidade de lixo nuclear produzida pela atividade do reator nuclear, minério de urânio necessário para abastecer a transição do reator da antiga AGR para a nova geração de reatores nucleares e combustível irradiado produzido devido à atividade nuclear até 2035.pt_BR
dc.description.resumoOne of the most important topics about nuclear programs is the economic development of their nuclear energy system. One of the most remarkable programs was the UK’s nuclear energy systems. Their first commercial nuclear power reactor connected to the grid was the Calder Hall -1 at Seascale in 1956. After that, 45 reactors built until 1995 for electricity production. Currently, 30 of them are permanently shutdown and 15, which comprises around 19% of the UK energy matrix are still operational. Despite the last reactor built in 1995 was a PWR - SIZEWELL-B connected to the grid 23 years ago, the UK government plans to build new generation plants to supply 19 GWe until 2025 and aims to have additional 16 GWe until 2023. This work shows the economic needs of the UK’s nuclear program to continue with their nuclear program. The software MESSAGE was used in the analysis taking into consideration the uranium spot price during the time. The results indicate the government investment needed to replace most of their current fleet with a new reactor fleet by 2025. This work also evaluates the economy of the nuclear fuel cycle comprising: mining price, fuel fabrication, the amount of nuclear waste produced by the nuclear reactor activity, the uranium ore needed to supply the reactor transition from old AGR to new generation of nuclear reactors, and spent fuel produced due to the nuclear activity until 2035.pt_BR
dc.description.sponsorshipCNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológicopt_BR
dc.description.sponsorshipFAPEMIG - Fundação de Amparo à Pesquisa do Estado de Minas Geraispt_BR
dc.description.sponsorshipCAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superiorpt_BR
dc.description.sponsorshipOutra Agênciapt_BR
dc.format.mimetypepdfpt_BR
dc.languageengpt_BR
dc.publisherUniversidade Federal de Minas Geraispt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentENG - DEPARTAMENTO DE ENGENHARIA NUCLEARpt_BR
dc.publisher.initialsUFMGpt_BR
dc.relation.ispartofSemana de Engenharia Nuclear e Ciências das Radiaçõespt_BR
dc.rightsAcesso Abertopt_BR
dc.subjectNuclear energypt_BR
dc.subjectUnited Kingdom of Great Britain (UK)pt_BR
dc.subjectMessagept_BR
dc.subject.otherEnergia nuclear - Reino Unidopt_BR
dc.subject.otherReatores nuclearespt_BR
dc.subject.otherCombustíveis para reatores nuclearespt_BR
dc.titleEconomic analysis of the UK nuclear energy system from 1956 to 2035pt_BR
dc.title.alternativeAnálise econômica do sistema de energia nuclear do Reino Unido de 1956 a 2035pt_BR
dc.typeArtigo de Eventopt_BR
dc.url.externahttps://sencir.nuclear.ufmg.br/anais/pt_BR
dc.identifier.orcidhttps://orcid.org/0000-0002-2960-3150pt_BR
dc.identifier.orcidhttps://orcid.org/0000-0002-8617-9413pt_BR
dc.identifier.orcidhttps://orcid.org/0000-0001-5999-9961pt_BR
dc.identifier.orcidhttps://orcid.org/0000-0001-8618-8195pt_BR
dc.identifier.orcidhttps://orcid.org/0000-0002-2445-3800pt_BR
Appears in Collections:Artigo de Evento

Files in This Item:
File Description SizeFormat 
Economic analysis of the UK nuclear energy system from 1956 to 2035.pdf329.09 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.