Please use this identifier to cite or link to this item: http://hdl.handle.net/1843/46989
Type: Tese
Title: Serviço de gerenciamento da terapia medicamentosa: processo de implementação em uma farmácia universitária ambulatorial por meio do active implementation framework.
Authors: Carlos Eduardo de Oliveira Pereira
First Advisor: Clarice Chemello
First Co-advisor: Simone de Araújo Medina Mendonça
First Referee: Carina Carvalho Silvestre
Second Referee: Reginaldo Adalberto de Luz
Third Referee: Adriano Max Moreira Reis
metadata.dc.contributor.referee4: Marcelo Silva Silvério
Abstract: A Ciência da Implementação trata sobre a inserção de serviços e esse processo promove mudanças e transformações na rotina de trabalho promovendo desafios para o funcionamento dos serviços, dentre esses, o Gerenciamento da Terapia Medicamentosa (GTM). Com este estudo, tem-se por objetivo estruturar o processo de implementação do GTM, em uma Farmácia Universitária. O método utilizado foi o Active Implementation Framework organizado em três etapas: I – revisão sistemática a respeito de barreiras e facilitadores que influenciam a implementação do GTM no ambiente ambulatorial; II – estudo de métodos mistos sobre a criação de uma disciplina no ensino remoto emergencial para qualificar os recursos humanos que atuarão no serviço de GTM; III – estudo qualitativo acerca da elaboração de um Guia de implementação do GTM. Os resultados com a revisão sistemática apontaram que a barreira mais citada está relacionada ao desconhecimento da existência do serviço pelos pacientes, já o facilitador mais citado referiu-se à existência de um adequado canal de comunicação entre o farmacêutico prestador do GTM e a equipe de saúde. Sobre o estudo de métodos mistos, demonstrou-se, segundo os estudantes, progresso no desenvolvimento de competências clínicas para a oferta do GTM, mesmo diante dos desafios do ensino remoto emergencial. Sobre o Guia, identificaram-se 15 etapas críticas, destacando-se as seguintes: o Plano de Implementação para guiar todos os esforços da equipe de implementação; a prospecção de recursos financeiros desde o início do processo de forma a não causar atrasos evitáveis; compilação de dados para formação de indicadores com o intuito de diagnosticar pontos de melhoria do serviço implementado. Dessa forma, para aumentar as chances de sucesso do processo de implementação, os responsáveis devem concentrar esforços para garantir previamente os recursos humanos, financeiros e materiais e estabelecer como o GTM irá interagir com outros serviços existentes e com os pacientes, sendo que todas as ações de implementação devem ser guiadas por uma metodologia validada.
Abstract: Implementation Sciences deals with the insertion of services and this process promotes changes and transformations in the work routine, promoting challenges for the functioning of services, among these, the Comprehensive Medication Management (CMM). With this study aims to structure a process of implementation of CMM services in a University Pharmacy. The methodology applied was the Active Implementation Framework, organized into three steps: I - a systematic review exploring barriers and facilitators influencing the implementation of CMM in outpatient settings; II - a mixed-methods study approaching the development of a course on the emergency remote teaching environment to capacitate human resources to operate in CMM services; III - a qualitative study developing a guide for the implementation of CMM. The results from the systematic review indicated that the most cited barrier was the lack of knowledge from patients about the existence of the pharmaceutical service, whilst the appropriate communication between the pharmacist offering CMM and other health care workers was the most frequent facilitator. In the mixed-methods study, students have shown improvements in the development of clinical competencies to the offering of CMM, even with the challenges of emergency remote teaching. As for the Guide to Implementation, 15 critical steps were identified, highlighting the following: an Implementation Plan to guide all the efforts of the implementation team; prospecting for financial resources from the beginning of the process so as not to cause avoidable delays; compilation of data for the formation of indicators in order to diagnose points of improvement of the implemented service. Thus, to increase the chances of success of the implementation process, the responsible team must concentrate their efforts to previously guarantee human, financial, and material resources, and to establish how CMM will interact with the other existing services and with patients, considering that all actions regarding the implementation should be guided by a validated methodology.
language: por
metadata.dc.publisher.country: Brasil
Publisher: Universidade Federal de Minas Gerais
Publisher Initials: UFMG
metadata.dc.publisher.department: FARMACIA - FACULDADE DE FARMACIA
metadata.dc.publisher.program: Programa de Pós-Graduação em Medicamentos e Assistencia Farmaceutica
Rights: Acesso Restrito
metadata.dc.rights.uri: http://creativecommons.org/licenses/by-nc-nd/3.0/pt/
URI: http://hdl.handle.net/1843/46989
Issue Date: 1-Jul-2022
metadata.dc.description.embargo: 1-Jul-2024
Appears in Collections:Teses de Doutorado

Files in This Item:
File Description SizeFormat 
CEOP_tese_finalizada.pdf
???org.dspace.app.webui.jsptag.ItemTag.restrictionUntil??? 2024-07-01
5.94 MBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons License Creative Commons