Please use this identifier to cite or link to this item:
http://hdl.handle.net/1843/61580
Type: | Monografia (especialização) |
Title: | Prazos de execução de obra |
Authors: | Thales de Mileto Fontoura de Fialho |
First Advisor: | Danielle Meireles de Oliveira |
First Referee: | Marys Lene Braga Almeida |
Abstract: | Este estudo tem por objetivo tratar do tema sobre prazos de execução de obra, abordando dificultadores recorrentes, com foco nos fatores associados a atrasos na entrega de edifícios de complexos habitacionais e propondo soluções para amenização de entraves que interferem na dilatação de prazos deste tipo de obra. Tais atrasos culminam em problemas relacionados ao aumento de custo (afetando a margem de lucro das obras), prazos de entrega para o cliente, e demais dificuldades inerentes aos replanejamentos. Ressaltou-se a influência de três fatores principais como motivadores de atrasos deste tipo de empreendimento, sendo eles a mão de obra, que em grande parte não possui a qualificação demandada para atingir uma produtividade ideal; a qualidade, devido a erros de produção e conferência no processo construtivo, o que ocasiona em uma série de retrabalhos não previstos e o planejamento/gerenciamento, essencial para se estruturar processos de compra, fechamento de contratos, histogramas, sequenciamento de atividades. Com objetivo de expor de forma prática a influência destes fatores é apresentado um estudo de caso no qual analisa-se a interferência deles na dilatação do prazo do determinado empreendimento pesquisado. Destacou-se a relevância do papel proativo e analítico do gerente do projeto (engenheiro de produção) na harmonia destes fatores, exigindo e utilizando aparatos que proporcionem maior assertividade ao longo do processo construtivo. |
Abstract: | This study aims to address the issue of construction execution deadlines, addressing recurring difficulties, focusing on factors associated with delays in the delivery of housing complex buildings and proposing solutions to alleviate obstacles that interfere with the extension of deadlines for this type of work. . Such delays culminate in problems related to increased costs (affecting the profit margin of the works), delivery times for the client, and other difficulties inherent to replanning. The influence of three main factors as drivers of delays in this type of project was highlighted, namely the workforce, which largely does not have the qualifications required to achieve ideal productivity; quality, due to production and checking errors in the construction process, which leads to a series of unforeseen reworks and planning/management, essential for structuring purchasing processes, closing contracts, histograms, sequencing of activities. With the aim of exposing in a practical way the influence of these factors, a case study is presented in which their interference in the extension of the term of the specific project researched is analyzed. The relevance of the proactive and analytical role of the project manager (production engineer) in the harmony of these factors was highlighted, demanding and using devices that provide greater assertiveness throughout the construction process. |
Subject: | Construção civil Edifícios de apartamentos Mão de obra Planejamento Construção civil - Projetos e construção |
language: | por |
metadata.dc.publisher.country: | Brasil |
Publisher: | Universidade Federal de Minas Gerais |
Publisher Initials: | UFMG |
metadata.dc.publisher.department: | ENG - DEPARTAMENTO DE ENGENHARIA MATERIAIS E DA CONSTRUÇÃO CIVIL |
metadata.dc.publisher.program: | Programa de Pós-Graduação em Construção Civil |
Rights: | Acesso Aberto |
URI: | http://hdl.handle.net/1843/61580 |
Issue Date: | 14-Apr-2023 |
Appears in Collections: | Especialização em Construção Civil |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Monografia - Prazos de Execução de Obra (Thales Fialho) - Arquivo para publicação.pdf | 1.17 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.